Nevada Sunrise Metals Corporation (TSXV: NEV) (OTCBB: NVSGF) has announced the completion of a maiden resource estimate by ABH Engineering Inc. on the Gemini Lithium Project in Nevada. The estimate reveals 7.1 million tonnes of lithium carbonate equivalent (LCE) within the project’s inferred resources.
Key Findings of the Gemini Lithium Resource Estimate
Latest drilling activities at Gemini identified significant lithium mineralization with strong geological continuity. With the completion of two-phased drilling spanning 7,330 feet, the estimate has outlined approximately 1,300 million tonnes lithium mineralized clay at 1,130 ppm lithium average grade.
Exploration Success and Expansion Potential
The Project, only partially explored, remains open in all directions. President and CEO Warren Stanyer expresses optimism for future expansion and economic assessments. Nevada Sunrise has ambitious plans for further exploration to fully realize Gemini’s potential.
About Nevada Sunrise
The Vancouver-based junior mineral exploration company has a strategic focus on lithium, gold, and copper projects in Nevada. Key holdings include the 100% owned Gemini, Jackson Wash and Badlands lithium projects, rights in the Coronado VMS Project, and a gold asset at Kinsley Mountain.
The technical information in this release is approved by Qualified Person Damir Cukor, P. Geo., in compliance with National Instrument 43-101 standards.
Disclaimer:
The content presented on this page has not been manually verified by our team. While we strive to ensure accuracy, we cannot guarantee the validity, completeness, or timeliness of the information provided. Always consult with appropriate professionals or sources before making any decisions based on this content.
The image is randomly selected and doesn’t necessarily represent the company or the news below.