LIFT Power Ltd. (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) announces intersecting significant spodumene mineralization at the Yellowknife Lithium Project in its latest drilling campaign.
Impressive Drill Results at Yellowknife Lithium Project
Highlighted drill hole results demonstrate the potential of the site, with YLP-0148 revealing 23 meters at 1.40% Li2O at the Fi Main pegmatite. Other notable intersections include 11 meters at 1.38% Li2O in the Nite pegmatite and 10 meters at 1.28% Li2O at the same site.
Expanding Li2O Potential at Fi Main and Nite Pegmatites
The company successfully tested various pegmatites. The Fi Main site continues to show a strong presence of lithium oxide, and further explorations at the Nite pegmatite have intersected additional promising zones. Details of the intercepts provide crucial data for advancing these projects.
Insights on the BIG West and Ki Pegmatites
Further explorations continue at the BIG West and Ki pegmatites with several intersections providing valuable geological information, even though the Li2O content was found to be less significant in these areas.
The company concludes the 2023 drilling campaign with 34,238 meters completed, and assay results are in from 156 out of 198 diamond drill holes.
LIFT Power Ltd., focusing on lithium pegmatite exploration in Canada, remains committed to developing its flagship project in the Northwest Territories, along with other properties in Quebec and within the Little Nahanni Pegmatite Group.
Disclaimer:
The content presented on this page has not been manually verified by our team. While we strive to ensure accuracy, we cannot guarantee the validity, completeness, or timeliness of the information provided. Always consult with appropriate professionals or sources before making any decisions based on this content.
The image is randomly selected and doesn’t necessarily represent the company or the news below.