Skip to content

LIFT Discovers High-Grade Lithium in Drill Results at Yellowknife Lithium Project

LIFT Power Ltd. (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) has announced the successful intersection of 23 meters at 1.50% Li2O at the Fi Southwest pegmatite within the Yellowknife Lithium Project (YLP), significantly bolstering the project’s mineralization profile.

Investment Highlights

The Yellowknife Lithium Project (YLP) recently made headlines with its remarkable drill results. The most notable highlights include:
– A 23 m intersection at 1.50% Li2O in the Fi Southwest pegmatite.
– A significant 12 m intersection at 1.51% Li2O in the Nite pegmatite.
– A promising 12 m intersection at 1.04% Li2O in the BIG West pegmatite, with segments reaching up to 1.62% Li2O.

Fi Southwest Pegmatite Revealed

The company reported that the drilling program focused on multiple pegmatite dykes within the Fi Southwest corridor, where mineralization appears to be consistent at depth with high-grade lithium concentrations. Core drilling also revealed new potential with multiple intersected lesser-known dykes.

Nite & BIG West Pegmatite Findings

Exploration of the Nite pegmatite delivered auspicious results, testing deeper and confirming the mineral trend. The BIG West pegmatite intersected notable widths and grades, contributing to the overall project’s upswing.

About Yellowknife Lithium Project

The Yellowknife Lithium Project is positioned east of Yellowknife, Northwest Territories. Accessibility and infrastructure are aided by local government-maintained roads, facilitating exploration and potential future development.

Further Exploration and Growth

The company has completed a significant portion of its drilling campaign, eagerly awaiting results for continued exploration and assessment. Visual logging suggests spodumene as the predominant mineral, with further mineralogical analysis underway to substantiate these findings.

Contact Information

Francis MacDonald, CEO of LIFT Power Ltd., is available for further commentary and can be reached at Tel: + 1.604.609.6185 or via Email: info@li-ft.com.

Disclaimer:
The content presented on this page has not been manually verified by our team. While we strive to ensure accuracy, we cannot guarantee the validity, completeness, or timeliness of the information provided. Always consult with appropriate professionals or sources before making any decisions based on this content.



The image is randomly selected and doesn’t necessarily represent the company or the news below.

Click here for more Company News

https://www.supertalk.fm/-/ https://planar.farmasi.uin-malang.ac.id/-/ https://faculdadediplomata.edu.br/-/ https://puskesmaskemangkon.purbalinggakab.go.id/-/gacor/ https://journal.dpkp.ciamiskab.go.id/